Okay, so we stayed after practice tonight and figured out what is left to be done. Here's my list:
Vandergelder's store
• Change casters on counter
• Put wood trim on counter
• Make stage right door piece look like stage left door piece (color-wise)
• Put wood strips on walls for shelves
• Put stuffed fabric and wood on lower walls
• Paint things on shelves
• Pretty picture on parlor wall
• Pretty border for top of the wall in parlor
• White trim and baseboards in parlor
• More blue paint in corner joint of parlor
• Little table with flowers in a vase in parlor
• Little pretty chair in parlor
• Broom in store
• Cash register and bell in store
• Black cat fireworks and some kind of pot to contain them
Yonkers Train Station
• Engine
• Complete caboose
• Hand holds for train
• Curtain in station door
• Schedule and Yonkers sign painted
Hat Shop
• Outside window
• Door and curtain door
• Bricks on outside walls
• Doorknobs
• Wood trim and baseboards painted to match window frame
• Card table
• Tablecloth
• Hats on wall
• Foam head
• Ribbon hat
• Hatboxes
• Outdoor bench
Hoffman House
• Paint drop and attach (possibly with gromets and nails?)
• Detachable foamboard sign
Harmonia Gardens
• Finish all white paint on stairs
• I'm not convinced ledge will be long enough, so that needs to be checked
• Hang curtains
• Two tables, six chairs, tablecloths, table settings and food
Courtroom
• Judge's bench
• Box for judge to stand on
Miscellaneous
• Outdoor lamp post (used in several scenes)
• Partition to hide sound system out front
• New York back wall
We will be working on some of these things tomorrow night at the Opera House, starting at 6 p.m. Everyone is welcome to come join in. We will need lots of help!